The imposition of an increased environmental fee for operating without a required permit or another administrative decision, and the cause of the absence of the permit or decision
DOI:
https://doi.org/10.12775/PYEL.2014.003Keywords
Increased environmental fee, operating without a required permit.Abstract
As long as the applicant files an application for a new permit well in advance, before the expiry of the existing permit, and allowing enough time for the application to be processed, and the new permit is not issued before the expiry of the existing one because of reasons attributable to the administrative body (such as its inaction or tardy proceedings), the issuance of a decision, referred to in article 193 section 4 EPA, is relevant for the holder of the existing permit. What follows is that the environmental fee should be paid at the rate applicable during the period of the previous permit from the moment of its expiry until the new one is obtained. It may therefore be found inadmissible to make an entity liable for the tardiness of administrative proceedings by imposing on it the increased environmental fees.
References
Gruszecki K., Komentarz do art. 276 ustawy - Prawo ochrony środowiska, Lex el. 1 June 2011.
Kiersnowska-Drzewiecka A., Opłaty za korzystanie ze środowiska jako koszt uzyskania przychodów, Doradca Podatkowy 2013, No 2.
Łuczak K., Glosa do uchwały NSA z dnia 12 grudnia 2011 r., II OPS 2/11, Glosa 2012, No 4.
Odpowiedzialność administracji i w administracji, eds. M. Stahl, Z. Duniewska, Warszawa 2013.
Parchomiuk J., Odpowiedzialność odszkodowawcza za legalne działania administracji publicznej, Warszawa 2007.
Sadowski P., Opłata podwyższona jako konsekwencja braku pozwolenia wodnoprawnego, Casus 2009, No 4.
Downloads
Published
How to Cite
Issue
Section
Stats
Number of views and downloads: 198
Number of citations: 0